← Zakázky

Commercial BOQ & Cost Take-Off

Rozpočet: $250 - $750 / ⭐ (0)

Bluebeam, Civil Engineering, Construction Management, Data Entry, Data Processing, Excel, Project Management, Quantity Surveying, Structural Engineering

I’m preparing a full bill of quantities for a new commercial building and need an accurate quantity take-off focused on cost estimation. Scope • Measure all materials and labour items directly from the latest drawings (architectural, structural only)... (Budget: $250 - $750 USD, Jobs: Bluebeam, Civil Engineering, Construction Management, Data Entry, Data Processing, Excel, Project Management, Quantity Surveying, Structural Engineering)
Otevřít na Upwork

AI proposal draft

Generate a short cover letter for this job. Edit before sending.

Sign in to generate an AI proposal draft.

Přihlásit