Commercial Building BOQ Take-Off
Budget: $15 - $25
/
⭐ (0)
AutoCAD, Bill of Materials (BOM) Analysis, Building Architecture, Civil Engineering, Construction, Construction Management, Excel, Quantity Surveying
I have a full drawing set for a new commercial building and now need an accurate Quantity Take-Off and Bill of Quantities focused solely on the structural package—concrete, reinforcement, structural steel, formwork, embeds and any related accessories... (Budget: $15 - $25 USD, Jobs: AutoCAD, Bill of Materials (BOM) Analysis, Building Architecture, Civil Engineering, Construction, Construction Management, Excel, Quantity Surveying)
Open job
AI proposal draft
Generate a short cover letter to copy into the offer. Says you are interested and ready to work.
Sign in to generate an AI proposal draft.
Log in