← Állások

Municipal Waste Incineration Engineer

Költségvetés: - / ⭐ (0)

Chemical Engineering, Environmental Engineering, Industrial Engineering, Mechanical Engineering, Process Engineering, Project Management, Technical Documentation

I need a combustion engineer to design an incinerator for municipal solid waste. The incinerator should handle up to 50 tons of waste per day. Key requirements: - Design for waste management - Municipal... (Budget: £10 - £15 GBP, Jobs: Chemical Engineering, Environmental Engineering, Industrial Engineering, Mechanical Engineering, Process Engineering, Project Management, Technical Documentation)
Megnyitás Upworkön

AI proposal draft

Generate a short cover letter for this job. Edit before sending.

Sign in to generate an AI proposal draft.

Bejelentkezés