Surface Mine Site Development Plan
Buget: -
/
⭐ (0)
AutoCAD, Data Analysis, Environmental Engineering, Excel, Geotechnical Engineering, Mining Engineering, PDF, Project Management
I’m gearing up to develop a new coal deposit using surface-mining methods and need an experienced mining professional to turn the exploration data I already have into a practical, fully costed site-development plan... (Budget: ₹750 - ₹1250 INR, Jobs: AutoCAD, Data Analysis, Environmental Engineering, Excel, Geotechnical Engineering, Mining Engineering, PDF, Project Management)
Deschide pe Upwork
AI proposal draft
Generate a short cover letter for this job. Edit before sending.
Sign in to generate an AI proposal draft.
Autentificare