← Live-лента

City Redline Response, Addition Remodel

Бюджет: $250 - $750 / ⭐ (0)

Architectural Engineering, Architecture, AutoCAD, Building Architecture, Building Design, Building Information Modeling, Civil Engineering, Structural Engineering

The building department just returned the first set of red-line comments for my ongoing addition and remodeling project. Most of their notes hit two areas: structural items—roof—and related architectural design adjustments... (Budget: $250 - $750 USD, Jobs: Architectural Engineering, Architecture, AutoCAD, Building Architecture, Building Design, Building Information Modeling, Civil Engineering, Structural Engineering)
Открыть заказ

AI-черновик отклика

Короткий текст отклика для копирования в оффер: интерес + готовность работать.

Войдите, чтобы сгенерировать AI-черновик.

Войти