← Live-лента

Insulated Timber Frame Redesign

Бюджет: $250 - $750 / ⭐ (0)

3D Modelling, Architectural Engineering, AutoCAD, Building Architecture, Building Design, Building Engineering, CAD/CAM, Drafting

I already have 16’ x 24’ timber-frame drawings that the Leelanau County building department accepted structurally, but they are drawn as an open, non-insulated structure. I now want to enclose the frame... (Budget: $250 - $750 USD, Jobs: 3D Modelling, Architectural Engineering, AutoCAD, Building Architecture, Building Design, Building Engineering, CAD/CAM, Drafting)
Открыть заказ

AI-черновик отклика

Короткий текст отклика для копирования в оффер: интерес + готовность работать.

Войдите, чтобы сгенерировать AI-черновик.

Войти